Sheet 01 / 04 — The Commitment

Clarity
before
commitment.

Renovating shouldn't feel like a gamble. Renii gives you a clear cost range and flags the risks that blow budgets — before you sign a contract or spend a penny on design.

UK · Currently optimised for kitchen extensions

Sheet 02 / 04 — Uncertainty, priced

Three quotes.
£70,000 apart.
Nobody can tell you why.

Renovation isn't stressful because of tiles. It's stressful because of uncertainty. The contract you signed excluded something you assumed was included. You found out after the work started.

Once you sign, the uncertainty becomes yours.

Sheet 03 / 04 — The Method

What you get,
before you commit.

01 — Project Preview

An indicative range to orient you.

A quick cost range — low, likely, high — with complexity classification and the factors most likely to move your number.

Free

02 — Renovation Intelligence Report

The full picture, before you commission a drawing.

Elemental cost breakdown with assumptions, exclusions, and variance flags. Planning context included — approval rates, conditions, and site constraints for similar applications nearby.

From £149

03 — Tender Comparison

Three quotes, one basis.

Builders submit through Renii. Same scope, same elements. Outliers flagged. Smart Questions generated for each quote.

From £495

Drawing 04 — Early access

Be first to try Renii
on your project.

Early-access users get the Project Preview free at launch — an indicative range, complexity classification, and the factors most likely to move your number.

Decision Matrix

The difference is what you know
before you sign.

Without ReniiWith Renii
Quotes use different assumptionsEvery builder prices against the same scope, so you can compare line by line Commitment Pack
Exclusions discovered after signingMissing items flagged before you commit
You rely on instinct to negotiateSmart Questions generated for each quote
Planning risks surface mid-designApproval precedents visible before you instruct anyone

Sheet 05 — Pricing

Priced against the cost
of getting it wrong.

A small fraction of your overall commitment, to make the rest of it better informed.

01 · Orientation

Project Preview

Free

03 · Commitment

Tender & Commitment Pack

From £495 £149 credited

Comparison

How Renii compares.

ReniiThree quotes, no frameworkHire a QSGeneric online estimate
What it tells youA structured cost range with the planning context and assumptions behind the numberThree prices — each priced to a different scopeA bespoke estimate from an independent professionalA rough £/m² figure with little project-specific context
When it's usefulBefore you commit — while decisions are still openAfter you've invested in plans and specificationsOnce drawings are ready to priceEarly curiosity — not a decision input
CostFrom freeFree — but expensive if wrong£1,500–£3,000+Free
IndependenceIndependent, grounded in UK construction cost benchmarks and live planning recordsBuilder has an incentive to win the jobIndependent expertNo project-specific grounding

Sheet 04 / 04 — The night before

The night before
you sign should
feel calm.

Clarity first. Commitment second.

No payment required · UK only at launch